Waitrose Aylesford off shore hook ups

Key Electrical were asked to design/manage and install 21 new electric trailer hook ups to Ambient warehouse docks to help reduce cost and reduce their carbon footprint.
A new 400A TP&N Isolator was installed in the switch room which included a full shut down of the mains supply to enable us to tap onto the existing Busbar, a new 150mm x 150mm trunking  installed from the isolator to the position of the new MCCB.240mm Tri-Rated cables were installed in the new trunking containment.
220m of ladder rack at high level was installed to accommodate 2 x 150mm 4 core swa cables and 1 x  95mm earth which were terminated into the new 24way panel board by docks.
From the newly installed 24 way panel board we installed 4 core swa cables that were run at high level on the new containment to various dock positions. 
New industrial 32 Amp 5 pin RCD sockets complete with isolators and 3 phase indicators were installed and connected.  
32 Amp TP MCB's were mounted within the new panel board and the new SWA’s terminated and tested. 

Key Electrical Duties:

  • Principle Designer
  • Principle contractor
  • Installation
  • Testing
  • Certification
  • BMS Monitoring system

     

     

 

 

 

 

IMG 4548 2 (1)
IMG 4632 2 (1)
IMG 4702 2 (1)
IMG 4833 2 (1)
IMG 4837 2 (1)
IMG 4838 2 (1)
IMG 4839 2 2
IMG 4843 2 (1)
IMG 4834 2 (1)
IMG 4632 2 (1)
IMG 4711 2 (1)
IMG 4836
IMG 2485
IMG 2483
IMG 4993 2 (1)
IMG 2490
IMG 4550 2 (1)
IMG 4534 2 (1)
Twitter LinkedIn Facebook Back to top More Service Icon 1 Service Icon 2 " Service Icon 3 Service Icon 4